C300
Specification Summary
Parameters
Value
Volume
8.22 m³
Loading Chambers Size
2.9m x 1.9m x 1.9m
Loading Method
Front
Load Capacity
300 kg
Refactory Thickness
191mm - 226mm
Gas Retention Time
2 Seconds
Afterburn Complies with EU Legislation
Yes
CE Certified
Yes
High Capacity Hospital Waste Incinerator Addfield C300.
The Addfield C300 is a modern hospital waste incinerator designed to burn solid waste in a clean and environmentally safe manner.
Using the pyrolytic principles of combustion, the C300 model has been specifically design for burning clinical waste from hospitals and research centres at a rate of up to 300kg/hr.
The machine is equipped with the necessary control systems, a primary and secondary after chamber with a two second residue time. The machine is available with an automatic bin tipper system, automatic ram charging system, vertical opening door, automatic de-ashing and gas cleaning equipment to satisfy the most stringent environmental standards.
The primary combustion chamber arrangement is a multiple stepped hearth refractory, with waste loading taking place at the highest level. Each hearth has an evacuation ram to manoeuvre the residue through the chamber and finally into the ash treatment zone. This design enables continuous operation during a 24 hour period with automatic ash removal during the cycle.
Only with this stepped hearth arrangement can a high capacity burn process happen. The movement of waste throughout the machine removes any potential cold spots, agitated the waste and allowing for an immensely high combustion efficiency.
Manufactured in Britain, to an extremely high standard, the machine uses heavy gauge steel work and a multi-layers brick lined refractory for maximum efficiency.
The C300 machine is suitable large hospitals. The machine would be able to service the equivalent of 2900-7200 beds. Depending on its geographical location as waste generation rates vary from country-to-country. Please contact us for more specific information.
Design Parameters of the C300 Clinical , Medical and Pharmaceutical Waste Incinerator:
- Waste Density Design – 50kg/m3 – 100kgm3
- Burn rate – Up to 300kg/hr
- Capacity – 1,200,000 Kcal/hr
- Bin tipper system – Yes
- Automatic loading – Yes
- Automatic de-ashing – Yes
Are you a waste management company looking for a bulk disposal solution? Then explore the Addfield TB-AB-MAX batch loading machine.
- British Designed.
British Built. - World leaders in
incineration technology. - Unrivalled build quality
& machine longevity. - Distributed to more
than 150 countries. - Environmentally
Responsible. - Trusted partner with over
40 years experience.